The technical academy in beni-swef was established for el-sewedy electrical to train students,
preparing technical and professional workers according to real practical site needs so we implement a drinking water purification plant to purify water from impurities and make it potable for using (300m3/day capacity) , also implement a sewage and industrial treatment plant to become eligible for pouring it into main exchange (160m3/day capacity)
Design and implement a water purification plant and a sewage treatment plant in terms of civil, mechanical and electrical works and then operation and maintenance for 1 year.
The first station: Implementation of a drinking water purification plant with a capacity of 300 m3/day
The second station: : Implementation of a sewage treatment water plant with a capacity of 160 m3/day
a) Sewage treatment plant
- Receiving water from the main sewage outlet inside sewage collection yard.
- A preliminary filtration of solid impurities is carried out through a bar screen before water enters the collection yard.
- Water pumps with mincers to chop impurities before entering water expulsion pipeline to enter calming and balancing stage to control in entering a suitable amount of water to be treated.
- Then comes biological treatment stage of water inside aeration tank exposed to sunlight supplied with air diffusers to treat water biologically to get rid of harmful bacteria.
- To settle sludge and calm water flow, sedimentation basin role is coming to settle impurities so that getting clean water, in which equalizing chlorine ratios after that, and then extract the sludge from collected sludge tank to dry it and use it as an organic fertilizer.
- Water is pumped into multi-media sandy filter to purify water from any impurities and then store it in collection tanks to use it in irrigating unfruitful lands.
- Improving national projects like elsewedy institute to prepare the best workers and technicians
- Implementation and operation in a record time to provide necessary elements of agricultural lands, homes and water.
- LOCATION : BANI SWIF
- PLANT TYPE : SEWAGE TREATMENT
- CAPACITY : 200 M³ / DAY
- WATER TYPE : GREYWATER
- CLIENT : NSPO
- CONSULTANT : GUIDE GROUP