In the last years , the country has been directed its concerns forward to implementing desalination and sewage treatment (dualism-triple) plants to maximize the benefit of each drop of water , reusing the treated water in specified purposes for that. From here the president directs the government to the necessary of integrating strategy of see water and wells desalination for planned management of water there for, desalination and purification plants has been implemented in ( Qebli qaroun – wadi elnatron – elwadi elgdid – elhamam) with a collaboration with the main contractor of the project.
Drilling wells until depth of 80m under earth surface , providing them with high pressure pumps in the bottom to lift salty water to desalinate it then distribution.
  • Preparing the layout of the project and taking many samples from the soil to test it to choice the perfect place of wells
  • After specifying the place of wells according to the soil report we start excavating by driller in stages to reach 80m underground surface
  • Pumping concrete to make hollow piles and isolating it to protect them from underground water
  • Increasing water resources as a result of the abundance declining of dulcet resources.
  •  Generate hydroelectricity energy due to pumping water to desalination stations which is used in turning on the stations as we can reduce the process cost highly.
  •  Improving the quality of water purification plants and developing them continuously with using modern methods are less harmful to human health and more efficiency to ensure a better result.
Scroll to Top